Navigation Menu

Click the "+" to see inside a chapter or use the search to the right.

.

Skip to end of metadata
Go to start of metadata

The Assignment tab of the Generate Reports page allows you to view details about assignments for all the users in the current project.


Similarly, Assignments reports for the entire Item Bank (all the projects in the Item Bank) can also be accessed through Manage Item Bank → Reports → Content → Item Bank → Assignments.

A total of nine different types of Assignment reports can be generated by combining the options under Include and For.

CriteriaOptionDescription
IncludeAll assignments, for this projectThe report contains details about all the assignments for the current project.
Only overdue assignments, for this projectThe report contains details about only those assignments for the current project, whose due date has passed with respect to the current date.
All assignments, for this project, with due dates within a specific date range

The report contains details about all assignments for the current project, within the specified date range of due dates.

ForAll usersThe report contains details about assignments for all users from the current project.
Only active usersThe report contains details about assignments for all active users from the current project.
Only inactive usersThe report contains details about assignments for all inactive users from the current project.

 

Generate the Assignments report

  1. To generate the report, make the selections for the Include and For options and click the CSV button next to Generate Report. A message in green text appears, confirming that the report is being generated.
  2. A notification balloon appears on the bottom right of the screen to notify users once the report is generated. The notification balloon appears only if you have logged in as the current user who requested the report with the project selection where the report was requested, and are not on the Queue tab.
  3. Click the balloon to open the Queue tab. The generated report can be accessed from here.
  4. Once generated, the report appears as a hyperlinked text with the name "Due Date Assignment" under the Report Name column. Click this hyperlink to download the report in the CSV file format.
  5. The generated CSV file of the Assignment report appear as below.


Icon

The "Due Date" column of the Assignments report is blank for those assignments where the due date has not been specified.

 

For Review, Translate, and Validate assignments where users have saved a search, the name of the saved search is displayed in the Criteria column. (In the example above, Question ReviewRainbow Review, and Translate are saved searches.)

For Write assignments and Write/Review/Validate assignments where the work was Auto-Assigned, the following format is displayed in the Criteria column: Blueprint: <ID> <Name>; <MetadataName>: <Comma separated list of values>.(e.g., Blueprint: I Mathematics; ContentCasey: A)

  • If multiple metadata are used, multiple semi-colon delimiters are used to separate the values: <MetadataName1>: <Comma separated list of values>; <MetadataName2>: <Comma separated list of values>
  • If blueprint is the only criteria: Blueprint: <ID> <Name>
  • If metadata is the only criteria: <MetadataName1>: <Comma separated list of values>

 

 

  • No labels